Reference

Factory Mosel/Zwickau unfinished building hall 2

Client

Volkswagen AG, Wolfsburg

Scope

Cooling water infrastructure

Task

The cooling water supply comes from PEHD 100 pipes with dimensions of DN 600 - DN 65. Some 800m of pipes with dimensions of DN 400 - DN 65, including pipe fittings and joints, were installed.

It was especially challenging to construct the fittings and to include the weight, expansion and its fixed point brackets.

A full pipe weighs 2.0 tons = 2,000 kg.